[Construction Case] Achieved cost reduction and shortened delivery time by switching to thermal spraying.
Successfully reduced the cost and shortened the delivery time of sintered insulation parts! The strength of the parts has also increased, and they no longer break.
We would like to introduce a case where we converted sintered products into metal substrates and applied insulation coating to the necessary areas. The customer faced challenges with sintered products being expensive, having long lead times, and the substrate sometimes breaking. By applying insulation coating, we were able to maintain the traditional insulation, reduce costs, and shorten lead times. 【Case Overview】 ■ Challenges - Sintered products are expensive, have long lead times, and the substrate can break. - We want to reduce costs and shorten lead times while maintaining the same level of insulation as before. ■ Results - Costs were reduced, and lead times were shortened. - By changing to metal, the strength of the parts increased, and breakage was eliminated. *For more details, please download the PDF or feel free to contact us.
- Company:日本コーティング工業 本社、大阪営業所、東京営業所、関西工場、東京工場
- Price:Other